Customization: | Available |
---|---|
Type: | Spiral Separator |
Voltage: | 380V |
Still deciding? Get samples of US$ 100000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Our bucket chain gold dredger is very fir for the alluvial sand with gold. If the river sand with a lot of big pebbles, the bucket chain type is one perfect choice.
Model |
RL-100 |
RL-200 |
RL-300 |
Parameters |
|||
Capacity |
100 tph |
200 tph |
300 tph |
Power |
150 kw |
200 kw |
300kw |
Bucket size/ cubic |
0.04 |
0.04 |
0.12 |
Clay Scrubber /mm |
φ1000*2000 |
φ1200*3000 |
φ1500*3000 |
Trommel Screen /mm |
φ1200*3000 |
φ1500*3500 |
φ1800*4000 |
Sluice Box |
2 sets |
3 sets |
4 sets |
Water Supply /m³ |
120 m³ |
240 m³ |
370 m³ |
Concentrators |
1 |
2 |
4 |
Recovery Rate |
98% |
98% |
98% |
1 | How many cubic meter per hour for the deal capacity? |
2 | The gold particle size in mm? |
3 | You will require the diesel generator? and any special requirement for the generator brand? |
4 | In the dredging raw ore, the sand & stone percentage? stone's size in mm? |
5 | How many meters for the dredge depth? |
Size (mm): φ1200*3000 or according to processing capacity
Remark: with inside water spray pipes
Function: to break off hard clays to increase gold recovery
*Coarse Gold Recovery System
Name: Vibrating chute + Gold chute
Vibrating chute type: Hydraulic type
Size: 6m*1m
Gold chute: Mitsubishi brand, imported from Japan
Function: for coarse gold recovery
Recovery rate: 95%
7.Powering system with diesel generator with all batteries, cables and wires.
8.Gold refinery plant to make final product of gold bars.
9. Easy for installation, operation and maintaining.
8.Factory introduce :